Blog
79
Avoiding Steel Pipe Sourcing Scams in China
How to check a Chinese steel pipe supplier before paying: licence and address, certificate validity, MTC heat numbers and staged payment terms.

LSAW Steel Pipe: Sizes, Grades, PSL
LSAW steel pipe explained: the longitudinal submerged arc weld, API 5L grade and PSL ordering rules, and the confirmed OD, wall and length range.

How ERW Steel Pipe Is Made and Used
ERW pipe is formed from coil and longitudinal-seam welded without filler metal. It is not seamless, and a grade minimum applies only to the named standard.

Seamless Steel Pipe: Process and Buying
Seamless pipe is pierced from a solid billet with no weld seam. Check the standard, size, schedule, heat treatment and certificate before ordering.

SSAW Spiral Welded Pipe: Process and Use
Spiral submerged-arc pipe forms coil on a helix and welds both sides. The standard decides piling, conveying pipe, or line pipe.

Seamless Pipe vs Welded Pipe Choice
Seamless pipe has no longitudinal seam. Welded pipe can meet the same grade when the specification and the seam tests say so.

Stainless Pipe Fittings: Types and Grades
Stainless pipe fittings are defined by type, NPS, schedule, grade and standard. ASME B16.9 covers butt-weld dimensions and ASTM A403 the wrought material.

Stainless vs Carbon Steel Flanges
Choose carbon steel flanges for non-corrosive service. Choose stainless when corrosion or cleanliness rules carbon steel out.

Welding Carbon Steel to Stainless Steel
What changes when carbon steel is welded to stainless steel: 309L filler choice, dilution control, interpass limits, post-weld pickling and passivation.

API 5L vs ASTM A312 Pipe for Oil and Gas
Use API 5L for carbon steel line pipe and ASTM A312 for austenitic stainless process pipe; they are not interchangeable specifications.

Stainless Pipe Manufacturer Audit Guide
Audit a stainless pipe manufacturer by product scope, process, heat traceability, inspection records and order-specific documents.

Welding Carbon Steel Pipe: Preheat, Filler
Welding carbon steel pipe is set by the code and the qualified procedure, not by one preheat table; agree WPS, filler and examination first.
