Skip to Content

Blog

79
Steel Pipe Lead Time from China Explained

Steel Pipe Lead Time from China Explained

Build a steel pipe schedule from technical approval, material availability, production, testing, release, booking and the agreed delivery point.

Steel Pipe Export Packaging and Shipping

Steel Pipe Export Packaging and Shipping

Build a pipe packing specification around product form, bundle limits, end protection, corrosion control, labels and the shipping route.

How to Audit a Chinese Steel Pipe Factory

How to Audit a Chinese Steel Pipe Factory

A steel pipe factory audit should verify equipment, process control, traceability, testing and calibration. Use this checklist before you qualify a mill.

How to Source Fasteners from China

How to Source Fasteners from China

Specify the standard, grade, size, thread and coating, then check the heat-treatment record and the certificate before you approve a fastener shipment from China.

How to Specify Forged Steel Flanges

How to Specify Forged Steel Flanges

Fix flange type, pressure class, facing and material grade before comparing forged-flange quotes. An open class or facing is not a complete order.

Steel Pipe Minimum Order Quantities

Steel Pipe Minimum Order Quantities

MOQ follows the production route, not a supplier rule. Confirm what sets the minimum for seamless, welded, stainless and alloy pipe before you ask for a price.

Third-Party Steel Pipe Inspection: Scope

Third-Party Steel Pipe Inspection: Scope

Agree the inspection scope, hold points and certificate type before production ends, so the tests you pay for are actually witnessed.

Incoterms 2020 for Steel Pipe Orders

Incoterms 2020 for Steel Pipe Orders

Use Incoterms 2020 to define delivery, risk, freight, insurance, and customs tasks in international steel pipe purchase orders.

Steel Pipe Supplier Certificates in China

Steel Pipe Supplier Certificates in China

Which certificates to check on a Chinese steel pipe supplier: ISO 9001 scope, API 5L and 5CT licences, PED and AD 2000, NACE MR0175 and the per-order MTC.

Compare Steel Pipe Origins Before You Buy

Compare Steel Pipe Origins Before You Buy

China, India, South Korea and Turkey can all make specification pipe. Compare the quoted standard, grade, size, tests and documents before you compare price.

Steel Pipe Payments: T/T vs Letter of Credit

Steel Pipe Payments: T/T vs Letter of Credit

T/T and a letter of credit allocate risk differently. Compare bank cost, document control and timing before agreeing terms on a pipe order.

Stainless vs Galvanized or Coated Flanges

Stainless vs Galvanized or Coated Flanges

Compare solid stainless flanges with galvanized or coated carbon steel by service, damage tolerance, inspection and maintenance needs.

Call UsWhatsAppEmailInquiry