Incoterms 2020 define where delivery occurs and how specified transport tasks, costs, and risks are divided between seller and buyer. They do not define the steel pipe, transfer title, set payment terms, or replace inspection, claims, and remedy clauses in the sales contract.
Use the named place or port as part of the rule
An Incoterm is incomplete without a precise named place or port and the edition. Write the chosen rule in the contract as the three-letter term, the exact location, and “Incoterms 2020.” The location matters because it identifies the delivery or cost point. A country, city, or broad port name may be too vague when several terminals, yards, or handover points are possible.
The International Chamber of Commerce publishes the rules. Use the official ICC Incoterms 2020 overview as the starting point and obtain the full rules or qualified contract advice when allocating a live shipment. A quotation label should not be treated as a complete logistics instruction.
FCA, FOB, CFR, and CIF are not interchangeable
| Rule | Permitted transport mode | Delivery and risk transfer | Main carriage and insurance |
|---|---|---|---|
| FCA | Any mode, including multimodal transport | When the seller delivers the goods to the buyer-nominated carrier or person at the named place, under the rule for that location | Buyer arranges main carriage; neither party is required by FCA to insure the other party's risk |
| FOB | Sea or inland waterway only | When the goods are on board the buyer-nominated vessel at the named port of shipment | Buyer arranges ocean or inland-waterway carriage; FOB does not require seller-arranged insurance |
| CFR | Sea or inland waterway only | Risk transfers when the goods are on board at the port of shipment | Seller contracts and pays freight to the named destination port; insurance is not a seller obligation under CFR |
| CIF | Sea or inland waterway only | Risk transfers when the goods are on board at the port of shipment | Seller contracts and pays freight to the named destination port and obtains the insurance required by CIF |
FCA is important for steel pipe moved by truck, rail, container, or a combination of modes. It can identify a factory, carrier facility, or terminal as the named place. The exact place determines how delivery is completed, so the contract should identify the handover point and state who loads or unloads there under the selected rule. Risk passes at that delivery point, not automatically at a seaport.
FOB is different. It applies only to sea or inland waterway transport, and the seller delivers when the pipe is on board the vessel nominated by the buyer. Risk transfers at that point. For a container handed to a carrier before vessel loading, FCA may describe the actual handover more accurately than FOB. The parties should match the rule to the real movement rather than select a familiar acronym by habit.
CFR and CIF also apply only to sea or inland waterway transport. Under both rules, delivery and risk transfer occur when the goods are on board at the shipment port, even though the seller pays the freight to a named destination port. This separation between the risk point and the paid-to point is essential. CIF adds seller-arranged insurance meeting the rule's requirement; CFR does not. Buyers should still review the policy, insured party, covered journey, exclusions, claims process, and any project-specific coverage required by the contract.
Keep product requirements outside the Incoterm
The Incoterm does not identify which pipe is acceptable. A purchase order for seamless carbon steel pipe still needs the standard and grade, NPS or outside diameter, wall thickness or schedule, length, quantity, end finish, coating, marking, inspection scope, documentation, and packing requirements. State the design or service conditions when they affect the selected specification. Do not rely on “FOB,” “CFR,” or “CIF” to fill any of these technical fields.
The contract also needs commercial and legal terms that Incoterms do not supply. These include price and currency, payment method and timing, transfer of title, inspection and acceptance, document deadlines, sanctions and export-control responsibilities where applicable, delay provisions, warranty, claims notice, remedies, governing law, and dispute resolution. Import permits, duties, taxes, and customs responsibilities should be checked against the selected rule and the laws at origin and destination.
Write an executable logistics schedule
Before accepting the order, buyer and seller should record:
- The exact Incoterm, named place or port, and “Incoterms 2020.”
- The physical delivery point and the evidence that confirms delivery there.
- The party booking each transport leg and the required pickup or shipment window.
- Export and import clearance responsibilities and the documents each party must provide.
- For CFR or CIF, the named destination port while preserving the separate onboard risk-transfer point.
- For CIF, the required insurance evidence and any additional coverage written into the sales contract.
- Pipe packing, bundle identification, lifting restrictions, protection, inspection release, and document set.
- The procedure for carrier delay, damage evidence, insurance notice, rejection, and claims.
This schedule makes the transaction auditable without inventing freight assumptions or treating one rule as universally cheaper. Choose the rule that matches the actual carrier handover, transport mode, internal logistics capability, and contract allocation. Then write the steel specification and commercial protections separately.
What do Incoterms decide?
They allocate delivery point, cost, risk and responsibility between buyer and seller under Incoterms 2020.
Does an Incoterm replace the sales contract?
No. Quantity, specification, inspection, payment and claims terms still need to be written into the contract.





