# Steel Pipe Payments: T/T vs Letter of Credit

June 28, 2026 James Blue, Piping Materials Specialist

![Steel Pipe Payments: T/T vs Letter of Credit](/uploads/images/blog_steel-pipe-payment-terms-guide-t-t-vs-l-c-10355584.webp)

A payment method allocates risk between buyer and seller. It does not change the pipe. A T/T moves money directly between banks and is fast. A letter of credit makes payment conditional on documents that the banks examine. On a pipe order the choice interacts with inspection, because the balance is usually released against documents that have to match the order.

## What is being balanced

Three factors decide the method: security, cost and timing. Security is who carries the risk if the other side does not perform. Cost is the bank charge and the internal work needed to prepare documents. Timing is how early the money leaves the buyer.

## T/T (telegraphic transfer)

A T/T moves funds on the buyer instruction. The common structure on a pipe order is a deposit with the order and the balance against shipping documents, usually a copy of the bill of lading. The deposit gives the mill working capital for raw material, and the balance is held until shipment is evidenced.

The buyer carries the risk that the deposit is paid before anything is made. That risk is usually managed with a pre-shipment inspection and by releasing the balance only after the documents and the inspection report match the order.

## Letter of credit

A documentary credit makes the bank payment obligation conditional on compliant documents. The buyer applies, the issuing bank issues, and the seller is paid on presentation of the documents the credit names: bill of lading, commercial invoice, packing list, and any inspection certificate the credit requires.

The protection is document-based, not quality-based. If the documents comply, the bank pays even while a dispute about the material is still open. Discrepancies are the usual cause of delay, so the document list has to be drafted carefully and the beneficiary name has to match the seller of record exactly.

## How the two compare

| Item | T/T deposit and balance | Letter of credit at sight |
| --- | --- | --- |
| Bank cost | Lower; charged per transfer by the banks involved | Higher; issuance, advising and negotiation charges |
| Speed | Faster to move the funds | Slower to open and to examine the documents |
| Buyer risk | The deposit is paid before production | Payment follows compliant documents |
| Seller risk | The balance depends on the buyer paying | Payment depends on document compliance |
| Document burden | Lighter | Strict compliance required |
| Typical use | Established relationships and mid-value orders | First transactions and high-value orders |

## Other methods

Documents against payment releases the shipping documents only after the buyer pays, so the goods are already in transit. Documents against acceptance releases them against a promise to pay later, which puts the credit risk on the seller. Open account ships and invoices with payment due later, and is normally reserved for an established payment record. None of these replaces knowing the counterparty.

## Where the risk actually sits

Payment fraud on international orders usually arrives as a change of bank details in an email. Confirm any change through a separate channel before releasing funds, and check that the beneficiary name matches the seller of record.

The balance should not be released until the order is identifiable. For a pipe line that means the grade, the heat number, and the measured outside diameter and wall: 114.3 mm by 6.02 mm on NPS 4 Schedule 40, or whatever the drawing states. A payment term cannot repair a document set that does not match the material.

Product pages that carry the identity those documents have to match include [seamless carbon steel pipe](/products/steel-pipe/carbon-steel-pipe/seamless-carbon-steel-pipe) and [API 5L Grade B seamless pipe](/products/steel-pipe/carbon-steel-pipe/api-5l-grade-b-seamless-pipe).

### What to Confirm with Your Inquiry

- Payment method, deposit and balance split, and when each falls due.
- Which documents trigger the balance, and who holds them.
- Whether a pre-shipment inspection is a condition of payment.
- Bank charges on each side, and the trade term the price is built on.
- Certificate type and the heat traceability the documents have to show.

For the standard those documents have to name, see [the ASTM, EN, JIS and GB pipe-standard comparison](/blog/steel-pipe-standards-comparison-astm-vs-en-vs-103541751).

## Frequently Asked Questions

### How does T/T usually work?

The buyer sends a telegraphic transfer deposit and pays the balance against agreed shipping documents.

### When is a letter of credit useful?

An LC adds bank-controlled document conditions, at additional cost and with stricter timing requirements.

Share [Facebook](https://www.facebook.com/sharer/sharer.php?u=https%3A%2F%2Fpipemanufactory.com%2Fblog%2Fsteel-pipe-payment-terms-guide-t-t-vs-l-c-103555841) [X](https://twitter.com/intent/tweet?url=https%3A%2F%2Fpipemanufactory.com%2Fblog%2Fsteel-pipe-payment-terms-guide-t-t-vs-l-c-103555841) [LinkedIn](https://www.linkedin.com/shareArticle?url=https%3A%2F%2Fpipemanufactory.com%2Fblog%2Fsteel-pipe-payment-terms-guide-t-t-vs-l-c-103555841)

[Send Inquiry](/inquiry?ref=steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841)

Latest Posts

- [!\[Steel Pipe Lead Time from China Explained\](/uploads/images/blog_steel-pipe-lead-time-from-china-complete-guid-1035.webp) Steel Pipe Lead Time from China Explained](/blog/steel-pipe-lead-time-from-china-complete-guid-103565829)
- [!\[Steel Pipe Export Packaging and Shipping\](/uploads/images/blog_steel-pipe-export-packaging-and-shipping-guide-103.webp) Steel Pipe Export Packaging and Shipping](/blog/steel-pipe-export-packaging-and-shipping-guide-103565688)
- [!\[How to Audit a Chinese Steel Pipe Factory\](/uploads/images/blog_how-to-audit-a-chinese-steel-pipe-factory-com-1035.webp) How to Audit a Chinese Steel Pipe Factory](/blog/how-to-audit-a-chinese-steel-pipe-factory-com-103565697)

## Related Products

[View More](/products)

![2507 Super Duplex Stainless Steel Plate (UNS S32750)](/uploads/images/duplex-steel-plate-sheet-3.webp)

### [2507 Super Duplex Stainless Steel Plate (UNS S32750)](/products/steel-plate/stainless-steel-plate/2507-super-duplex-stainless-steel-plate-uns-s32750)

2507 super duplex stainless steel plate for projects that specify S32750 (2507). S32760 is a related grade with slight elemental differences and must be specified separately. Confirm the requested grade, applicable product standard and dimensions before quotation.

![304L Stainless Steel Plate](/uploads/images/ss304-plate-9.webp)

### [304L Stainless Steel Plate](/products/steel-plate/stainless-steel-plate/304l-stainless-steel-plate)

304L stainless steel plate is the low-carbon form of 304, supplied as UNS S30403 for welded platework. Confirm thickness, width, length, finish and the purchasing standard.

![304 Stainless Steel Plate](/uploads/images/ss304-plate-7.webp)

### [304 Stainless Steel Plate](/products/steel-plate/stainless-steel-plate/304-stainless-steel-plate)

304 stainless steel plate (UNS S30400, ASTM A240) in mill and polished finishes for industrial fabrication, food processing equipment, and structural work. Provide thickness, width, length, and finish to receive a quotation.

![Duplex Steel Coil](/uploads/images/duplex-steel-coil-4.webp)

### [Duplex Steel Coil](/products/metal-steel-coil/stainless-steel-coils/duplex-steel-coil)

Duplex steel coil in 2205 (UNS S31803 / S32205, EN 1.4462) to ASTM A240, giving higher yield strength and chloride pitting resistance than 304/316 coil. Grades 2205, 2304 and 2507 are available; thickness, width, finish and coil build are confirmed at quotation.

```json
{"@context":"https://schema.org","@graph":[{"@type":"Organization","@id":"https://pipemanufactory.com/#organization","name":"Gangyou Steel Manufacture Company","alternateName":"Gangyou Steel","url":"https://pipemanufactory.com","logo":"https://pipemanufactory.com/uploads/images/ecfa6bb3-faec-48b0-8daa-81c94219bdaa.png","description":"Gangyou Steel supplies steel pipe, plate, coil, flanges, pipe fittings, fasteners, structural sections, round bar and industrial valves in carbon, stainless and alloy steel, from Foshan, China.","telephone":"+86-15875546993","email":"info@pipemanufactory.com","address":{"@type":"PostalAddress","streetAddress":"Gangtieshijie D7Qu 401 Jiagongqu er Road","addressLocality":"Foshan","addressRegion":"Guangdong","postalCode":"528000","addressCountry":"CN"},"contactPoint":{"@type":"ContactPoint","telephone":"+86-15875546993","email":"info@pipemanufactory.com","contactType":"customer service","availableLanguage":["en","es","de","fr","it","nl","pt","th","ko","vi","ja","id","ru","tr","zh-Hant","ar","no","hmn"]},"sameAs":["https://www.facebook.com/jerry.he.7731","https://www.instagram.com/jerry.he.7731"],"knowsAbout":["https://en.wikipedia.org/wiki/Steel","https://en.wikipedia.org/wiki/Stainless_steel","https://en.wikipedia.org/wiki/Carbon_steel","https://en.wikipedia.org/wiki/Alloy_steel","https://en.wikipedia.org/wiki/Duplex_stainless_steel","https://en.wikipedia.org/wiki/Pipe_(fluid_conveyance)","https://en.wikipedia.org/wiki/Piping_and_plumbing_fitting","https://en.wikipedia.org/wiki/Flange","https://en.wikipedia.org/wiki/Fastener","https://en.wikipedia.org/wiki/Valve","https://en.wikipedia.org/wiki/Structural_steel","https://en.wikipedia.org/wiki/Sheet_metal","https://en.wikipedia.org/wiki/Galvanization"],"hasCertification":[{"@type":"Certification","name":"PED 2014/68/EU Directive","issuedBy":{"@type":"Organization","name":"TUV Rheinland"},"validFrom":"2024-03-29"},{"@type":"Certification","name":"ASME U-Stamp Certification","issuedBy":{"@type":"Organization","name":"The American Society of Mechanical Engineers"},"validFrom":"2026-06-09"},{"@type":"Certification","name":"NORSOK M-650 Qualification","issuedBy":{"@type":"Organization","name":"DNV GL"},"validFrom":"2024-07-07"},{"@type":"Certification","name":"ISO 3834-2 Welding Certification","issuedBy":{"@type":"Organization","name":"TUV Nord"},"validFrom":"2024-08-11"},{"@type":"Certification","name":"Lloyd Register Type Approval","issuedBy":{"@type":"Organization","name":"Lloyd Register"},"validFrom":"2024-05-04"},{"@type":"Certification","name":"China CCC Certification","issuedBy":{"@type":"Organization","name":"CNCA"},"validFrom":"2024-08-31"},{"@type":"Certification","name":"ABS Steel Manufacturing Certificate","issuedBy":{"@type":"Organization","name":"American Bureau of Shipping"},"validFrom":"2024-04-17"},{"@type":"Certification","name":"FPC Certificate EN 1090-1","issuedBy":{"@type":"Organization","name":"TUV Rheinland"},"validFrom":"2024-06-24"}]},{"@type":"WebSite","@id":"https://pipemanufactory.com/#website","name":"Gangyou Steel Manufacture Company","url":"https://pipemanufactory.com","publisher":{"@id":"https://pipemanufactory.com/#organization"},"inLanguage":"en","potentialAction":{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https://pipemanufactory.com/products?q={search_term_string}"},"query-input":"required name=search_term_string"}}]}
{"@context":"https://schema.org","@graph":[{"@type":"WebPage","@id":"https://pipemanufactory.com/blog/steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841#webpage","url":"https://pipemanufactory.com/blog/steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841","name":"Steel Pipe Payments: T/T vs Letter of Credit - Gangyou Steel","description":"Compare T/T and a letter of credit for steel pipe orders: bank cost, document control, timing, and where the risk sits on each method.","isPartOf":{"@id":"https://pipemanufactory.com/#website"},"inLanguage":"en","primaryImageOfPage":{"@type":"ImageObject","url":"https://pipemanufactory.com/uploads/images/blog_steel-pipe-payment-terms-guide-t-t-vs-l-c-10355584.webp"},"breadcrumb":{"@id":"https://pipemanufactory.com/blog/steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841#breadcrumb"},"mainEntity":{"@id":"https://pipemanufactory.com/blog/steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841#article"},"datePublished":"2026-06-28T12:00:00+08:00","dateModified":"2026-06-28T12:00:00+08:00"},{"@type":"BreadcrumbList","@id":"https://pipemanufactory.com/blog/steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://pipemanufactory.com/"},{"@type":"ListItem","position":2,"name":"Blog","item":"https://pipemanufactory.com/blog"},{"@type":"ListItem","position":3,"name":"Steel Pipe Payments: T/T vs Letter of Credit","item":"https://pipemanufactory.com/blog/steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841"}]},{"@type":"BlogPosting","@id":"https://pipemanufactory.com/blog/steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841#article","headline":"Steel Pipe Payments: T/T vs Letter of Credit","url":"https://pipemanufactory.com/blog/steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841","inLanguage":"en","isAccessibleForFree":true,"datePublished":"2026-06-28T12:00:00+08:00","dateModified":"2026-06-28T12:00:00+08:00","author":{"@type":"Person","name":"James Blue","jobTitle":"Piping Materials Specialist"},"publisher":{"@id":"https://pipemanufactory.com/#organization"},"mainEntityOfPage":{"@id":"https://pipemanufactory.com/blog/steel-pipe-payment-terms-guide-t-t-vs-l-c-103555841#webpage"},"description":"Compare T/T and a letter of credit for steel pipe orders: bank cost, document control, timing, and where the risk sits on each method.","image":["https://pipemanufactory.com/uploads/images/blog_steel-pipe-payment-terms-guide-t-t-vs-l-c-10355584.webp"],"wordCount":660,"articleSection":"Blog","keywords":["steel pipe"],"about":[{"@type":"Thing","name":"steel pipe"}]}]}
{"@context":"https://schema.org","@type":"FAQPage","mainEntity":[{"@type":"Question","name":"How does T/T usually work?","acceptedAnswer":{"@type":"Answer","text":"The buyer sends a telegraphic transfer deposit and pays the balance against agreed shipping documents."}},{"@type":"Question","name":"When is a letter of credit useful?","acceptedAnswer":{"@type":"Answer","text":"An LC adds bank-controlled document conditions, at additional cost and with stricter timing requirements."}}]}
```